| 1 |
Direct-Drive Oil-Free Portable |
1.1–2.2 kW |
24–50 L |
8 bar |
100–220 L/min |
Light maintenance, airbrushing, inflating, intermittent workshop use |
220–240 V, 50 Hz, single-phase; 110–120 V versions may be available |
IEC 60204-1 electrical safety; applicable local low-voltage and EMC requirements; tank conformity where applicable |
Typically 12 months for the complete unit; wear parts may be excluded |
Replacement piston rings, valves, filters, and electrical components; multilingual manuals and wiring diagrams |
Confirm noise rating, duty cycle, plug type, voltage tolerance, and availability of replacement pump assemblies |
| 2 |
Direct-Drive Lubricated Workshop |
1.5–3.0 kW |
24–100 L |
8–10 bar |
140–320 L/min |
Garage tools, cleaning, fastening, small spray-painting tasks |
220–240 V single-phase; selected versions in 110–120 V |
ISO 12100 risk assessment; IEC 60204-1; pressure-vessel requirements based on destination market |
Usually 12 months, subject to oil, drain, and maintenance conditions |
Oil specification, service intervals, drain-valve replacement, motor protection, and local repair capability |
Check delivered air rather than displacement; verify thermal protection and suitability for the intended duty cycle |
| 3 |
Belt-Drive Single-Stage |
2.2–5.5 kW |
100–300 L |
8–10 bar |
250–650 L/min |
General workshops, tire service, pneumatic tools, small fabrication shops |
220–240 V single-phase or 380–415 V three-phase, 50 Hz |
ISO 12100; IEC 60204-1; belt-guarding and pressure-equipment requirements for the import country |
Typically 12–24 months for manufacturing defects |
Belts, pulleys, valves, bearings, condensate drains, motor starters, and maintenance training |
Confirm belt-guard design, foundation requirements, starting current, shipping dimensions, and spare-belt availability |
| 4 |
Belt-Drive Two-Stage |
3.0–7.5 kW |
150–500 L |
10–15 bar |
350–900 L/min |
Higher-pressure workshop tools, service centers, light industrial production |
380–415 V, 50 Hz, three-phase is common; selected single-phase options |
ISO 12100; IEC 60204-1; ISO 8573-1 for air-quality requirements when air treatment is added |
Commonly 12 months, with longer coverage negotiable for the pump assembly |
Two-stage valve and cylinder service, oil analysis guidance, pressure-switch support, and trained technicians |
Evaluate cooling, recovery time, operating temperature, pressure-switch range, and compatibility with local power supply |
| 5 |
Heavy-Duty Cast-Iron Reciprocating |
5.5–11 kW |
300–1,000 L |
10–15 bar |
650–1,500 L/min |
Manufacturing workshops, machinery maintenance, metalworking, continuous shop use |
380–415 V, 50 Hz, three-phase; 460 V, 60 Hz variants may be available |
ISO 12100; IEC 60204-1; destination-country pressure-vessel inspection and electrical conformity |
Typically 12–24 months, subject to installation and preventive maintenance |
Commissioning instructions, vibration checks, crankcase service parts, valve kits, and response-time commitments |
Request foundation and lifting data, duty-cycle limits, ambient-temperature range, and recommended service-kit list |
| 6 |
Low-Pressure High-Flow Piston |
4.0–15 kW |
200–1,000 L |
4–8 bar |
700–2,500 L/min |
Blow-off, packaging, pneumatic conveying support, general plant air |
380–415 V, 50 Hz, three-phase; 460 V, 60 Hz configurations subject to motor selection |
ISO 12100; IEC 60204-1; ISO 8573-1 where cleanliness or moisture limits are specified |
Usually 12 months; extended warranty may require approved installation and service records |
Capacity testing, motor-starter support, intake-filter replacement, vibration monitoring, and troubleshooting documentation |
Compare FAD at the stated pressure, not only nominal displacement; check receiver volume and peak-demand recovery |
| 7 |
High-Pressure Two- or Three-Stage |
5.5–22 kW |
100–500 L |
20–40 bar |
250–1,200 L/min |
PET preform production support, pressure testing, specialized industrial processes |
380–415 V, 50 Hz, three-phase; regional voltage and frequency options require confirmation |
ISO 12100; IEC 60204-1; applicable pressure-equipment rules; additional safeguards for high-pressure service |
Often 12 months, with major components covered only under defined operating conditions |
Stage-specific valve kits, inter-cooler inspection, pressure-relief testing, specialist commissioning, and safety training |
Verify final pressure, FAD at final pressure, relief-valve certification, pipe ratings, and operator access controls |
| 8 |
Oil-Free Medical or Technical-Air Piston |
1.1–15 kW |
24–500 L |
7–10 bar |
80–2,000 L/min |
Dental systems, laboratories, electronics, instrumentation, clean technical air |
110–120 V or 220–240 V single-phase; three-phase configurations for larger units |
ISO 8573-1 air-quality classification; ISO 12100; IEC 60204-1; sector-specific requirements where applicable |
Commonly 12 months; filters, valves, and other consumables may have separate terms |
Air-quality verification, sterile or coalescing filter support, dew-point guidance, and documented maintenance procedures |
Specify required air quality, noise limits, dew point, redundancy, receiver hygiene, and validation documentation |
| 9 |
Low-Noise Enclosed Piston |
2.2–7.5 kW |
50–300 L |
8–10 bar |
200–850 L/min |
Indoor workshops, laboratories, education facilities, service areas with noise restrictions |
220–240 V single-phase or 380–415 V three-phase, depending on capacity |
ISO 3744 or equivalent acoustic test method; ISO 12100; IEC 60204-1; local EMC requirements |
Normally 12 months, with enclosure components covered according to supplier terms |
Fan and ventilation service, acoustic-panel replacement, filter access, thermal alarms, and remote troubleshooting |
Confirm measured sound-pressure conditions, ventilation clearance, enclosure dimensions, and ambient-temperature limits |
| 10 |
Trailer-Mounted or Engine-Driven Piston |
5–30 kW engine equivalent |
100–1,000 L |
7–15 bar |
500–3,000 L/min |
Remote construction, field maintenance, agricultural service, locations without reliable grid power |
Diesel or gasoline engine; auxiliary electrical output varies by configuration |
ISO 12100; applicable engine-emission rules; road-trailer, lighting, braking, and pressure-equipment regulations |
Often 12 months for the compressor package; engine and trailer terms may differ |
Engine service parts, cold-start guidance, battery support, trailer inspection, field-service network, and emergency response |
Check emissions certification, fuel compatibility, towing regulations, weather protection, payload, and service access |